Skip to main content
Home
About
Services
Projects
Estimating
Careers
Contact
Home
About
Services
Projects
Estimating
Careers
Contact
US 301 Bullfrog
Hillsborough County, FL
Watson Civil was awarded this surety takeover FDOT project after the previous contractor defaulted.
This project includes widening of 3.8 miles of the existing two lane undivided SR 43 (US 301) to a six lane divided roadway.
Over 37,000 LF
drainage ranging from 18” to 60”
18,000 LF
Underdrain
concrete box culvert
pond liners
over 34,000 LF
JPA utilities
(water, sewer and reclaimed)
bridge construction
over Bullfrog Creek
asphalt
shared use path
milling and resurfacing
concrete sidewalk
lighting
ITS
signalization and flexible paving
Prev
Next