FDOT contracted Watson Civil to reconstruct 2 miles
of SR 15 (US 17) from a two lane rural road to a four
lane urban section with a 12-foot shared use path
over a 730-day schedule.
12,240 feet of drainage improvements, curb and
gutter, sidewalk construction, traffic signals, lighting,
and highway signing.