This significant environmental project removed nitrogen and phosphorus loads being discharged into the St. Johns River, helping to preserve the longest river in Florida.
Excavated and placed
50,000 CY of material
Constructed
35.5 acre stormwater pond
inflow and outflow canals
Constructed
stormwater pump station
47 acres of wetlands and an irrigation pumping system