Project reconstructed 1.62 miles of SR 10 from a two lane rural road to a four lane urban section with bike lanes in each direction over a 550 day schedule. Excavated more than 250,000 CY of material for detention ponds, constructed 70,000 SY of roadway, 15,000 feet of drainage improvements, curb and gutter, traffic signals, highway signing and sidewalks.