Skip to main content
US 301 Bullfrog

US 301 Bullfrog

Hillsborough County, FL

Watson Civil was awarded this surety takeover FDOT project after the previous contractor defaulted.
This project includes widening of 3.8 miles of the existing two lane undivided SR 43 (US 301) to a six lane divided roadway.
  • Over 37,000 LF
    drainage ranging from 18” to 60”
  • 18,000 LF
    Underdrain
  • concrete box culvert
  • pond liners
  • over 34,000 LF
    JPA utilities
    (water, sewer and reclaimed)
  • bridge construction
    over Bullfrog Creek
  • asphalt
    shared use path
  • milling and resurfacing
  • concrete sidewalk
  • lighting
  • ITS
  • signalization and flexible paving